Commit graph r-builds/CLAUDE.md
Author SHA1 Message Date
c144a0c8b9
fix(alpine): build R with cairo, png, jpeg and tiff graphics devices
The Alpine builder images install R-dev but never the graphics headers.
R's configure treats those as optional and does not fail when they are
absent, so the build succeeds and ships an R whose capabilities() reports
cairo, png, jpeg and tiff as FALSE. Installing the runtime libraries on
the target system afterwards cannot bring compiled-out devices back.

Note that --with-x=no was not the cause. R's bitmap and pangocairo checks
run independently of R_X11, and libpng was in fact found. capabilities("png")
needs a device backend, and with X11 off and cairo absent there was none,
which is why all four read FALSE. X11 stays off: these are headless images
and cairo covers png()/jpeg()/tiff()/svg().

- Install pkgconf, cairo-dev, pango-dev, fontconfig-dev, freetype-dev,
  libpng-dev, jpeg-dev, tiff-dev and zlib-dev in every Alpine builder image.
- Pass --with-cairo, --with-libpng, --with-jpeglib and --with-libtiff
  explicitly so the intent is visible next to --with-x=no.
- Assert REQUIRED_CAPABILITIES after make install, so a build that loses a
  device fails instead of being packaged and uploaded. Opt-in per Dockerfile,
  leaving the other platforms untouched.
- Add a FORCE_REBUILD escape hatch to the dedup step. Artifact filenames
  carry only the R version, so the HEAD probe would otherwise keep skipping
  every Alpine version and serving the stale broken binaries.
- Record the three gotchas in CLAUDE.md.

Verified by compiling R 4.5.1 in the patched alpine-322 image: jpeg, png,
tiff and cairo are TRUE, default bitmapType is cairo, and all four devices
render. The guard was exercised in both directions against that build.
2026-09-18 09:02:37 +02:00
56d26ef59c
docs: add CLAUDE.md with B2 storage gotchas and CI workflow conventions for agents
All checks were successful
ci/crow/cron/build/14 Pipeline was successful
ci/crow/cron/build/5 Pipeline was successful
ci/crow/cron/build/3 Pipeline was successful
ci/crow/cron/build/9 Pipeline was successful
ci/crow/cron/build/2 Pipeline was successful
ci/crow/cron/build/7 Pipeline was successful
ci/crow/cron/build/10 Pipeline was successful
ci/crow/cron/build/13 Pipeline was successful
ci/crow/cron/build/1 Pipeline was successful
ci/crow/cron/build/12 Pipeline was successful
ci/crow/cron/build/11 Pipeline was successful
ci/crow/cron/build/6 Pipeline was successful
ci/crow/cron/build/8 Pipeline was successful
ci/crow/cron/build/16 Pipeline was successful
ci/crow/cron/build/4 Pipeline was successful
ci/crow/cron/build/15 Pipeline was successful
ci/crow/cron/build/17 Pipeline was successful
ci/crow/cron/build/18 Pipeline was successful
2026-07-02 08:43:35 +02:00